« Beatrix Potter's Birthday | Main | Big and Small, Room for All! »

Central Drive-Up Renovation Begins Aug. 1

On Saturday, July 31 at 5:00 p.m., Central Library drive-up services will close for renovation. The drive-up is located on N. 8th St. between Wisconsin Ave. and Wells St. on the east side of the library. The renovation is expected to be complete in the fall of 2010.

During the renovation, please return items to drop boxes located farther south on N. 8th, just north of Wisconsin Ave. For all other library services, please enter Central Library or use a neighborhood library if more convenient.

MPL-DriveUp%20Exterior[1].jpg

Highlights of the renovation include adding an automated library materials handling system for returns, improving lighting and insulation to increase energy efficiency, adding digital signage, improving the exterior driveway, and improving ADA accessibility to Centennial Hall.


Bookmark and Share

TrackBack

TrackBack URL for this entry:
http://blog.mpl.org/mt_cgi/mt-tb.cgi/1285

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)

About

This page contains a single entry from the blog posted on July 29, 2010 1:37 PM.

The previous post in this blog was Beatrix Potter's Birthday.

The next post in this blog is Big and Small, Room for All!.

Many more can be found on the main index page or by looking through the archives.