East Branch Library Construction Update

| No TrackBacks

The back half of the library is finally starting to catch up to the impressive progress seen on the North Avenue side! Here's what the front of the library looks like now:

2014-3-12 (10).JPG

You can see where the huge front windows will be installed, which will look in on our main seating area:

 2014-3-12 (8).JPG

The large opening seen here, surrounded by the purple material, is where the main entrance will be, on Cramer St. The entrance to the parking lot will be to the left of the entrance as pictured here:

 2014-3-12 (7).JPG

Here's the current view from behind, facing E Thomas Ave:

2014-3-12 (2).JPG

And from the corner of Thomas Ave and Cramer St:

2014-3-12 (3).JPG

 

More to come!

 

 

No TrackBacks

TrackBack URL: http://blog.mpl.org/mt_cgi/mt-tb.cgi/3148

About this Entry

This page contains a single entry by Margaret published on March 12, 2014 6:30 PM.

This Week for Children @ the Bay View Library (3/9/14-3/15/14) was the previous entry in this blog.

This Week for Children @ the Bay View Library (3/16/14-3/22/14) is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.